⚡ Phase 1 — Vehicle & Charger Type
🇸🇾
Syria Installation Context: All system designs account for partial grid availability (≥50% daily outages) and mandatory integration compatibility with existing residential/commercial solar PV systems.
🚗 EV Brand & Model
🏗️ Phase 2 — Site & Installation Details
🏢 Installation Context
🏠 Residential
🏭 Commercial
🅿️ Auto Park
🏡 Villa
🏭 Factory
⛽ Station
〰️ 1-Phase (230V)
≋ 3-Phase (400V)
⚡ Charger Power & Quantity
🔒 Main Panel & Grid
Enter the rating of the main breaker at the distribution panel
☀️ Yes — Solar PV
🔲 No Solar
🔬 Phase 3 — System Engineering Study
📋 Phase 4 — Single Line Diagram & Report
📐 Single Line Diagram (SLD)
📋 System Report